Brush fire was reported in the area of 822 Bay St. E8, E2, Brush 1, Chief 2 operated at that incident. At this time all companies have returned to service
11 month agoFirefighters still spraying water on the vacant warehouse on Forbes St in Chelsea. Part of the building has collapsed and with concern that more might collapse onto the MBTA Commuter Rail tracks, the Newburyport/Rockport line has been suspended until further notice
Crews battling massive 9-alarm warehouse fire in Chelsea
11 month agoStriking a 9th Alarm Chelsea MA early this morning
Douglas   MA   149 Se Main St   BRUSH FIRE   Units o/s with a working brush fire behind several residences. Fire has been contained, crews have extensive mop up. 2 mutual aid brush units requested   
11 month agoCHELSEA Massachusetts FIRE Forbes Street 8th alarm fire
11 month agoChelsea MA, 4th, 5th,6th,7th,8th alarms have been transmitted for Creasant & Forbes st large 5 story vacant mill building well involved.
11 month agoView from Revere Beach
Crescent ave | u/d command reporting a 100x200 5 story mill type building fully involved crews have assumed a defensive posture on the neighborhood blitz guns in use building starting to collapse on the c side
8 alarms Chelsea  large 5 story vacant mill building well involved.
3 taken to hospital after New Bedford house fire 
Chelsea   MA    Forbes Street at  Cresent Avenue    MULTI ALARM FIRE   Crews are working fire in a large vacant warehouse, DWH. Setting up exposure protection for the neighborhood. Defensive ops. 
11 month agoCFPA Massachusetts member Julian Tague (@857FirePhotos) is on the scene of a large brush fire in Worcester, MA
11 month agoDetail companies are working on hot spots,as embers from the fire traveled to the tree next door. BFD-FIU on scene investigating the cause of the fire.Damages are estimated at 350,000
11 month agoCompanies starting to make up from the 2 alarm fire on Draper st, detail companies will remain to monitor any hot spots.There are 6 residents displaced by the fire
11 month agoHeavy fire knocked down companies are overhauling
11 month agoheavy fire from a house on floors 1&2 from a multi family home at 147 Draper st. Dorchester.a second alarm was immediately ordered
Fall River police investigating stabbing
Working fire Cambridge Ma, outside fire extended to building, 2.5 wood 30x90, fire knocked down,  companies overhauling
Working fire Cambridge Ma, 25 Lowell St
Large brush fire in the area of Locust St and Woodside Terrace E3, E2, Brush 1, Tac 3 and Chief 2 are on scene operating
11 month ago2nd alarm of fire Lexington Ma
2nd alarm of fire Lexington Ma, 113 Concord Ave
Worcester   MA   184 Belmont St - Chandler Hill Park   BRUSH FIRE   Units o/s with a working brush fire in the park. Unk size or rate of spread  
Box alarm/brush fire Middleton Ma, Gates Rd, mutual aid North Reading Engine 3
Teen arrested in connection with shooting on MBTA station platform
Firefighters battling blaze at Stoneham home
2nd alarm Stoneham Ma,  companies setting up Ladder 1s ladder pipe, Woburn Tower 1 to set up on D side to set up master stream, exterior attack
Rutland   MA   12 Campbell    BRUSH FIRE   Crews on scene in the area, working an approximately 1/2 acre of brush burning. M/A working on the scene also  
Crews battle high winds, fierce flames which started brush fire at Plymouth residence